For Subdivisions QLD, Sunshine Coast Civil delivered the civil works for a 2-lot rural residential subdivision on Duke Road, Doonan, including an upgrade of the council road frontage.
Scope of works
105 m
Barrier kerb and channel
110 m
Subsoil drainage
40 m
Swale
300 m²
Driveways
2,000 m²
Hydromulch
We upgraded the Duke Road frontage under traffic control, with new pavement, primer seal, asphalt and barrier kerb, and built the stormwater, swale, kerb inlet and headwall. Concrete and asphalt driveways, earthworks to the building pad, hydromulch and turf completed the works. Council accepted the roads and stormwater on maintenance in November 2024.