Sunshine Coast Civil delivered the complete civil works for a 31-lot residential community at Peregian Springs, developed by Cube Developments, from rock excavation and high retaining walls through to roads, sewer, water and stormwater.
Scope of works
6,300 m³
Cut to fill
880 m²
Retaining walls (14 walls)
540 m
Stormwater pipe
480 m
Sewer
550 m
Kerb and channel
2,600 m²
Road pavement
The site was tight, among existing homes, with rock that had to be hammered out for earthworks, sewer and driveways. We built 14 retaining walls, some 3 to 4 m high, in concrete sleeper and stone pitching, then delivered the road, footpaths, driveways, stormwater, bioretention basins, water reticulation and 31 sewer connections. Tree protection zones and erosion control were managed throughout.