Sunshine Coast Civil is the principal contractor delivering the civil works for a new residential subdivision in Pomona, in the Noosa hinterland.
Scope of works
Our scope covers site clearing and demolition, dewatering and mucking out an existing dam, bulk earthworks with imported fill, sleeper retaining walls, the new road from subgrade through to asphalt, concrete driveways and footpath, stormwater drainage and cut-off drains, a bio-retention basin with a grouted rock spillway, sewer and water reticulation, and service conduits.
With the site sitting beside an existing waterway, erosion and sediment control and the bio-retention basin are a key part of the job.